|
Economic Confidential,
February, 2009
FOCUS
BUDGET 2009 OF
KADUNA STATE
ADDRESS OF HIS EXCELLENCY ARC. MOHAMMED NAMADI SAMBO, fnia,
THE EXECUTIVE GOVERNOR OF KADUNA STATE
AT THE PRESENTATION OF THE 2009 BUDGET
TO THE HONOURABLE MEMBERS OF
THE STATE HOUSE OF ASSEMBLY
ON TUESDAY 3rd FEBRUARY . 2009
I am most humbled to be before the House to present the Draft Budget
Estimate for the year ended 2009.
Permit me Mr. Speaker and Honourable members to express our sincere
gratitude for the support we enjoyed throughout last year from
Members for the approval of the Appropriation Bill into an Act
through to the Oversight Functions during its implementation.
As the elected representatives of the people, you have ensured the
inclusion of the collective interest of your people in the approved
Budget which we have executed in the last fiscal year.
You will recall Mr. Speaker, Honourable Members, last year, we
appropriated a budget size of N94,079,240,755.00 comprising
N41,725,734,500 and N52,353,506,245 as Recurrent and
Capital Expenditures respectively.
Subsequently, a Supplementary Budget of N19,032,813,295 which
was prompted by an additional revenue accruing to the State for
specific power projects and additional grants was approved for
Capital Expenditure. This has by no means improved our Statutory and
other internal and external revenue profile in the year under review
in line with our great Party Manifesto the People's Democratic Party
(PDP) and its implementation through our 11-point Agenda. We have
impacted positively on the lives of the good people of the State in
almost all the sectors of the economy.
SECURITY
Our security drive and effort speaks for itself. In the
first phase of this programme codenamed Operation Yaki, we
procured 50 single cabin Toyota Hilux, twenty double cabin Toyota
Hilux, six fully equipped ambulances, seven 406 Peugeot saloon cars
for Intelligence and Surveillance duties while in the second phase
which was launched recently, we procured additional 30 Toyota Hilux
four-wheel vehicles, 1,000 bullet proof vests, 250 motorcycles
complete with riding boots, vests and other accessories, 20 horses
for Mounted Troop as well as Global Positioning System(GPS)
equipments which have been fitted at the headquarters of the
Operation Yaki Command to assist in Communication and Monitoring
services.
Contract for the construction of a new Mobile Police
Barracks in Zaria has since been awarded at the cost of N480million
and work is at advanced state. This is to further enhance the
security position in the State.
EDUCATION
Government as you are aware submitted last year a Draft Budget
proposing the utilization of 27% of the entire budget on Education
which you graciously approved. This is with a view to pursuing its
programme on Free and Compulsory Primary Education and the General
Development of the Education Sector.
To ensure that higher education is catapulted to an
enviable height in the State, contracts for the development,
rehabilitation and construction of additional classrooms,
laboratories, ICT Centres equipping of libraries, etc were awarded.
The benefiting institutions are the State University, College of
Education Gidan-Waya, Nuhu Bamalli Polytechnic Zaria, College of
Nursing Kafanchan and Shehu Idris College of Technology, Makarfi.
The summarised breakdown of the expenditure by the Ministry is as
follows:
1.
N1.5Billion
for the construction of additional infrastructure (classrooms,
laboratories, etc.), renovation of dilapidated structures,
procurement of classroom furniture, provision of science technical
and vocational equipment and the provision of water in over 200
secondary schools across the State.
2.
N400million
on State University for the provision of University central library,
3nos lecture theatres, microbiology staff offices,
internet café and Conference Room, Language laboratory, office block
for Political Science Department, Student Affairs office,
Educational Trust Fund laboratory equipment and lecture rooms as
well as the establishment of the Faculty of Medicine.
3.
A cumulative sum of N25million was spent on the
renovation of the State Library headquarters, Saminaka and B/Gwari
branches and offices and construction of drainages at the Kaduna
State Scholarship Board.
4.
N670million
was expended at the College of Education Gidan Waya for the
construction of additional lecture rooms, hostels and library
amongst others while the Teachers' Service Board office was
renovated and additional office equipments were procured.
5.
The monumental performance of the State at the National
Examinations Council (NECO) results in which the State was placed 2nd
in performance to which previously it occupied 15th- 20th
position, was a milestone that is a result of our commitment and
pragmatic steps taken to ensure rapid educational development.
Motivated to ensure optimal performance the State awarded contracts
for repairs, renovation and supply of furniture, fixtures and
equipments to Primary and Secondary schools across the State.
6.
New classrooms, games village, renovation of classrooms,
toilet booths, boreholes, pupils’ textbooks and uniforms were
provided in the year under review. A total of 752,072copies of
textbooks in four core subjects and 376,036 sets of uniforms were
distributed to 118,018 pupils in 238 primary schools across the
State. Furthermore, 1,326 new classrooms were built, 297 games
village, 375 renovated classrooms, 1,174 toilet booths, 118
boreholes, 49981 pupils furniture (two seater desk and benches),
2381 staff furniture and furnishing of 30 libraries across the
State. All these are in the cumulative sum of N4.3billion.
7.
Also, the sum of N150million was expended on the 10
schools under management board for the improvement of infrastructure
in these schools.
HEALTH/ENVIRONMENT
Our Free Medical Services for Pregnant Women and Children
under Five was a story of huge success in the preceding year. A
total of 115 Primary Healthcare Centres (PHCs) and 28 hospitals were
utilized to dispense services and the feedback on the drugs
distribution, have confirmed the desired impact among the citizens
of the state at both Rural and Urban areas.
To arrest maternal and child mortality, our Free Medical Care for
Pregnant Women and Children under five, which commenced in September
2007 was targeted to address mortality related problems and improve
life expectancy. At our 28 General Hospitals and 115 Primary
Healthcare Centres across the State, 512,838 pregnant women and
846,756 children under five (5) years totaling 1,359,594 were
beneficiaries of the scheme. Furthermore, a total of 2889 women
enjoyed free caesarian section performed at these primary and
secondary health centres throughout the State.
We plan to give Kaduna a facelift which will place it in
its rightful position in the country. A total sum of over N400million
was spent in the construction and rehabilitation of hospitals across
the State. Furthermore, Contract for the construction of a 200 bed
specialist and teaching hospital to the tune of N4,002,498,369.70
at the New Kaduna Millennium City has since been awarded with a 30
month completion period.
We launched a war against malaria in the year under review. Malaria
being a disease burden since time immemorial has remained endemic in
our country. Specifically in our dear State, malaria accounts for
about 60% of out-patient attendance in our health facilities. The
endangered species at risk are pregnant women and children under
five (5).
To arrest and control the potency of this scourge and to rescue this
number of people endangered by this dangerous insect, we declared a
total war against malaria. This is with a view to ensuring that it
no longer becomes a major cause of mortality in Kaduna State.
We have made concerted efforts at improving Hygiene and healthy
environment to complement our drive towards beautifying our cities,
It is an established fact that indiscriminate disposal of solid
wastes including hazardous wastes from health institutions and
industries without due regard to hygiene and sanitation accounts for
outspread of diseases. This habit is cultivated due to lack of a
sensible and affordable waste disposal system. Wastes abound in
urban as well as rural areas; at municipal streets and express
highways, depicting a story of refuse anywhere and everywhere.
Our markets and motor parks including toll gates present
particularly depressing sights. Mountains of refuse have become more
or less permanent features of many towns and cities leading to
blockages in roads, drains and streams.
In order to remedy the unhealthy situation, we have outsourced the
garbage disposal in Kaduna Metropolis to 20 firms at an annual cost
of about 700 Million naira while the State Government has made
available 10 no compacting trucks, heavy duty pay-loader, 300 metal
dustbins and 640 garbage containers of various sizes in building
capacity, enhancing the efficient and effective solid waste
management and to arrest the spread of diseases arising from poor
waste management. Every one of us can attest to the success of this
scheme.
TRANSPORTATION
We have completed 25 Roads some of which were inherited while others
were awarded by this administration. We conceived and awarded the
Kauru Bridge which is nearing completion. This bridge was a
consequence of our political campaign promises which we strived to
fulfill.
Government has secured the registration of the Railway Transport
Company. This company has since been responsible for the
implementation of Railway Transport Services in Kaduna State.
These actions were done in phases. The first phase of the programme
covers only the Kaduna Metropolis while the second phase is a
statewide rail transport system. These will consequently lead to the
reduction in transportation fare and general economic goods which
will certainly lead to the improved purchasing power of our people.
Towards the end of the preceding year, the third phase of the rail
programme was launched. This will afford the movement of goods from
Lagos to Kaduna Junction through our train service while goods will
be cleared at the Inland Dry Ports in Kaduna. This action will have
the advantage of engendering trading and business activities at the
Dry Ports and becoming a source of gainful employment to our
citizenry.
POWER SUPPLY
We are determined to increase the capacity of power
generation in the State. Toward attaining that feat, we established
an agency for power generation which is saddled with the
responsibility of generating electricity using both hydro and fuel
power generation systems.
At this juncture, it is pertinent to extend our sincere
appreciation to Mr. President for granting his gracious approval for
the State to evacuate 30MW hydro electricity generated at Gurara for
use at our Industrial Estate in Kaduna. This project is planned to
be completed by July 2009.
To be able to evacuate the 30MW of electricity, we
appointed consultants to design the 132KVA Sub-Station and work has
commenced in earnest. On completion, more jobs will be created for
our teeming youths. Furthermore, efforts were made in the
acquisition of 250nos 300-500KVA transformers for
distribution to various communities with a view to addressing the
power outages in these areas.
AGRICULTURE
Agriculture also received Government's attention in the year under
review. Successes were attained in the procurement and distribution
of farm inputs and implements. Fertilizer procurement was
unprecedented as a total of 70,000 metric tonnes of fertilizer was
procured at the cost of N7billion and successfully
distributed to the grassroots farmers. 60 no Tractors were
distributed to all the local government for tractor hiring service
by our co-operative farmers while arrangements have been completed
to take delivery of 108 tractors for distribution to co-operative
societies and private parties interested in commercial tractor
hiring services for the 2009 farming season. With these strides,
further agricultural activities will receive a boost in the
following areas:-
1.
Implementation of the Root and Tuber Expansion Programme (RTEP);
-
The National Special Programme on Food Security (NSPFS);
3.
The National Fadama Development Programme II (NFDP II);
-
Continuation of the ongoing activities under National Fadama
Development Programme I ;
-
Implementation of the New Rice for Africa Project (NERICA);
-
Implementation of Kaduna State Agricultural Enhancement
Programme;
7.
Flagging off of the Community based Agricultural and Rural
Development Project; and
8.
The completion of Grain Silo projects at B/Gwari, Lere,
Saminaka and Kafanchan with 10,000MT capacity each.
To further boost agricultural development and further enhance its
labour employment capabilities, government has identified 60
locations for the construction of irrigation schemes. In the first
phase of the programme, contract for the construction of eight (8)
irrigation schemes, and one Dam were awarded. Namely, Farakwai,
Pambegua, Jagindi, Angwan Jaba, Igabi, Panshanu, Kaya and Bakin Kogi
Schemes, while contract for the construction of the Hunkuyi dam in
Kudan Local Government Area has also been awarded. The value of
these contracts is in the cumulative sum of N1.250billion and
are at various stages of completion
Water Supply:-
We are determined to provide portable drinking water
supply across the State. The Galma Dam currently under construction
in Kubau Local Government Area by GILMOR Nig. Ltd has provided for
us a platform to solve once and for all the Zaria Regional Water
Supply problem.
Zaria town and environs have been suffering from
acute water shortage for over 20 years. The situation is
increasingly becoming chronic.
Studies of the pathetic situation revealed a water demand of
129mld for the present population of about 1.2million against an
installed capacity of 60mld. Unless and until a pragmatic effort is
made, the situation will continue to worsen.
As a lasting solution to the problem, the State
Government awarded the contract for a new 150mld water treatment
plant to Mothercat Limited at the cost of N15,711,199,558.14 for a
period of 36months.
The new water treatment plant is a regional scheme
intended to serve towns and villages in five Local government Areas.
The towns and villages to be served are:-
(i)
Zaria City
(ii)
Wusasa
(iii)
Tudun Wada
(iv)
Sabon Gari
(v)
Samaru
(vi)
Shika
(vii)
Giwa
(viii)
Mararraban Yakawada
(ix)
Basawa
(x)
Hunkuyi
(xi)
Kudan
(xii)
Dambo
(xiii)
Maigana
(xiv)
Soba
(xv)
Dutsenwai
(xvi)
Kubau, and
(xvii)
Pambeguwa
Similarly, the following water supply contracts were
awarded in the year under review under the National Urban Water
Sector Reform Project. The aim of these projects is to increase
access to pipe borne water in five urban towns of Kaduna
Metropolis, Kafanchan, Kagoro, Zonkwa, and Saminaka by
rehabilitating and expanding their existing water supply schemes at
the total contract sum of N4.9billion.
JBG Gauff was awarded the Consultancy
Service contract for Construction and Supervision of Kaduna
Metropolitan Water Supply Scheme in September last year at the
Contract Price of N143,848,959.63 with a Completion Period of
17 months. The scope of work includes:
a)
Rehabilitation of Water Treatment Plants and Booster Stations
awarded to Unipumps Nigeria Limited.
b)
Rehabilitation of Transmission Mains, Service Reservoirs and
Distribution network awarded to CGC Nigeria Limited.
c)
Rehabilitation of Industrial buildings, Offices and Staff
Quarters awarded to Consolidated Contractors Limited.
Contracts for the rehabilitation of Water Treatment Plant
and the Booster stations in Kaduna Metropolis with the aim of
restoring them to their original installed capacities were awarded.
The following infrastructures are affected:
a)
Kaduna North New Water Treatment Plant of 150 Million Litres
per day (MLD) Capacity.
b)
Kaduna North Old Water Treatment Plant of 90MLD Capacity.
c)
Kaduna South Water Treatment Plant of 27MLD Capacity.
d)
Lugard hall Booster Station.
e)
State House Booster Station.
f)
Tudun Wada Booster Station.
g)
Barnawa Booster Station.
The contract was awarded in May last year to Unipumps
Nigeria Limited at the Contract price of N829,574,993.68 for
a period of 15months.
The contract for the rehabilitation of Transmission Mains AND
Reservoirs for Kaduna Water Supply was awarded to CGC Nig Ltd in
August 2007 at a contract price of N282,914,856.95 with a
contract period of 15months.
The contract for the Rehabilitation of Distribution
Network for Kaduna Water Supply was awarded in August 2007 to CGC
for the replacement of weak and undersized asbestos service mains of
about 30km at the contract price of N400,023,056.97 for a
period of 15 months.
Consolidated Contractors Limited was awarded the
contract for the Rehabilitation of Industrial Buildings, Offices and
Staff Quarters for Kaduna Schemes at the cost of N244,941,235.21
The contract was signed in December 2008.
Due to persistent portable water supply problems at
the Nigerian Airforce Base, Government decided to intervene and
have awarded the Contract for the works to Messrs Bran and Lubbe at
the cost of N169,316,726.25 consisting of Dam Rehabilitation,
Installation of a 100m3/hr Package Water Treatment Plant, Erection
of Overhead Tank, Laying of Transmission and Gravity Mains.
The need for the expansion of water supply
infrastructure for Kaduna Metropolis cannot be overemphasized and is
therefore receiving utmost attention. Government has recognized the
fast rate of growth of Kaduna Metropolis and consequently the
initiative to open Kaduna Eastern Sector.
In this regard, the State Government has appointed
consultants to carry out Feasibility and Engineering Designs for the
Regional Expansion of Kaduna Metropolitan Water Supply Scheme up to
the year 2025.
Following the fire incidence of 10th of
August, 2007 which occurred at Kaduna North New Water Works
High-Lift Pumping Station, we embarked on replacement of all damaged
and associated equipment in the 11KV Switch Room and High-Lift
Pumping Station. Four Contracts were awarded as follows:
(a) Supply and Installation of 2 No. 11/3.3kV, 3.5MVA
Power Transformers at the cost of N92,775,264.42 for a period
of 4 months. The contract has been successfully completed and
commissioned.
(b) Contract for the Supply and Installation of 2 No
715KW and 2 No 200KW Weir Pumps and Motors at new High Lift Pumping
Station was awarded in the same period to Messrs Prime Power at the
cost of N162,329,983.20 which has also been satisfactorily
completed and commissioned.
(c) Siemens Nig. Ltd also supplied and installed 11/3.3kV
Breaker and Electrical Control (MCC) Panels for the High-Lift
Pumping Station at the cost of N177,031,371.74 with a
completion period of 10 months.
(d) In order to arrest the causes of fire outbreaks at
the Malali Treatment Plant, Power Conditioning Equipments were
installed by GANTE Engineering Services on the Electric Power
Sub-Stations of the plant at a contract sum of N141,816,990.78.
This will arrest the menace of power fluctuations which usually
results in damaging equipment and causing fire outbreaks.
(e) In order to ensure constant and functional water
supply at both Malali and Zaria water supply schemes, a specialist
water supply management company Messrs Otech of South-Africa has
been contracted to manage and train the Kaduna State Water Board (KSWB)
personnel in improving their capacity on service delivery. In fact,
Mr. Speaker it is my pleasure to inform you that zaria is now on
33KV since a week ago and the service has been fine all this while.
There is no doubt that we are today witnessing an
improved and positive water supply position in Kaduna Metropolis.
Rehabilitation of Kafanchan/Kagoro Water Supply Schemes
was awarded to Sarplast (West Africa) Ltd for a contract period of
12 months at the cost of N513,269,603.63. The works consist
of:
a)
Rehabilitation of Water Treatment Plants in Kafanchan and
Kagoro covering Civil, Mechanical and Electrical Works;
b)
Replacement of 13.6KM of old Asbestos Cement Pipes with
Ductile iron Pipes in Kafanchan;
c)
Replacement of 13.15KM of Asbestos Cement Pipes with Ductile
iron Pipes in Kagoro;
d)
Rehabilitation of Service Reservoirs;
e)
Supply and Installation of 6nos Bulk Meters of 100
to 500mm diameter; and
f)
Supply of laboratory equipment.
Next is the Rehabilitation of Zonkwa and Manchok Water
Supply Scheme awarded to Bran & Lubbe at the sum of N493,805,519.00
for a period of Twelve months. The contract consists of:
a)
Rehabilitation of Water Treatment Plant covering Civil,
Mechanical and Electrical Works;
b)
Rehabilitation of Office Buildings and Staff Quarters at
Manchok and Zonkwa;
c)
Replacement of 37,000m of Asbestos Cement Pipes/PVC pipes
with ductile iron pipes in Manchok and along Kagoro and Madakiya
Roads;
d)
Rehabilitation of Service Reservoirs at Magauri and Madauchi;
e)
Supply and Installation of 4nos Bulk Meters; and
f)
Supply of Laboratory equipment.
Also, Rehabilitation of Saminaka Water Supply Scheme was
awarded to Unipumps and Bolaji Nig Ltd at the sum of N615,000,525.57
for a contract period of Twelve months. The contract works consist
of:
a)
Rehabilitation of Water Treatment Plant covering Civil,
Mechanical and Electrical Works;
b)
Replacement of 7,000m of Asbestos Cement Pipes with Ductile
iron Pipes;
c)
Rehabilitation of Service Reservoirs at Anguwan Bawa and
Kauran Dan Gambo;
d)
Supply and Installation of 4no. Bulk Meters; and
e)
Supply of Laboratory equipment.
On the completion of these projects, the general portable
water supply situation in all the towns and their environs will be
greatly enhanced and made available to about two (2) million
beneficiaries.
The Engineering Design for the Kachia Surface Water
Supply Project was initially considered in 1978 and Construction
Contract was awarded in 1981. The features of the project included
construction of a 2.99mcm Impounding Reservoir, 3.15mld Water
Treatment Plant and Distribution System. The contract was
unfortunately abandoned at 5% progress.
We have now decided to revive the project in consideration
of the large population in Kachia and its environs and have already
appointed Messrs Tahal Consultants after Due Process to carry out
the feasibility and engineering design of the project,
Our water supply programmes in the rural areas of
the state consist of over 500 new motorized and handpumps boreholes
and rehabilitation of 70 no abandoned boreholes with over 1.5million
rural population benefiting from the programme.
POVERTY ALLEVIATION
Various empowerment mechanism, were adopted by Government. In the
first phase of the Poverty Alleviation Programme, the Government
distributed 275 water pumps, 300 knitting machines and 327 sewing
machines to beneficiaries spanning the 23 Local Governments in the
State.
In the transport scheme, to assist Okada Motorcycle Riders
and the National Union of Road Transport Workers (NURTW) Government
has distributed the first 100 Golf Cars to beneficiaries and it is
about distributing the second 100 Golf and Toyota Carina cars. 100
buses were procured and will soon be distributed to members of
National Association of Road Transport Owners (NARTO) and NURTW in
the State. All these is with the view of improving the transport
system in the State and to arrest the menace of poverty.
Agro-Based Empowerment Strategy:-
This programme was carried out in collaboration with Ministry of
Local Government and Centre for Entrepreneurship and Social
Development (CESD) to find lasting solutions to the issue of youths
disempowerment, pervasive unemployment, restiveness and criminality
in the State through the provision of training materials
(equipment/inputs and subsequent formation of 23 Multipurpose
Co-operatives Societies in all the 23 Local Government Areas for
institutionalized funding to alleviate poverty. These Cooperative
Societies have already benefited from loans of N350.000.00 per
Cooperative Society disbursed by Microfinance Banks through Farmers
Empowerment Scheme of the Ministry of Agriculture during the last
farming season.
Micro-credit Loan Scheme (Interest-free) for Women (widows) and
Youths:-
This scheme has been in effect since 23rd January. 2008.
A total of 200 petty traders have benefited from the N10,000
each, interest-free loan through Ajiya and Kada Micro Finance Banks
within Kaduna Metropolis.
Chalk and Paint-Making Cottage Industries:
- we have set up 6 chalk and 17 paint making cottage industries, one
each in the 23 Local Government areas of the State. The project
which was jointly handled by the Ministries of Science and
Technology, Solid Minerals, Poverty Alleviation and the local
governments performed creditably with the commissioning of the
cottages on the 23rd January 2008. A total of 147 young
men and women successfully graduated as producers of chalk and white
paint.
Data Collection of Unemployed Graduates and Petty Traders:-
In our deliberate quest to actually tackle poverty throughout the
nooks and crannies of the State, we have directed the State Poverty
Alleviation to employ the services of 518 males and females
unemployed graduate youths throughout the State. These data
collectors were sent to all the 255 wards of the State to collect
data on all unemployed graduates and petty traders. The data
collectors have so far completed their 6 months assignment
(June-November, 2008) and allowances paid to them for the period.
A lot of data have been obtained from this exercise and is being
stored in our data bank which will be used to properly plan on how
to assist in micro-credit delivery programmes in the 2009
appropriation.
Photography Training for Youth Development: -
This programme is to give hope to youths through skill
acquisition and empowerment by preparing our youths to pursue a
professional career in photography with ability for indoor and
outdoor photography, video coverage, video editing, processing and
printing of color and non-color photographs in their studios. Twenty
three (23) State sponsored candidates selected from each of the
Local Government Area were given eight weeks training on
professional photography which was concluded on the 23rd
December, 2008. The graduates of this training have been presented
with their certificates and starter-package of photography
equipment.
Farmers Empowerment Programme:-
The State Government in 2008 growing season approved the sum of One
Hundred Million Naira only (N100,000,000.00) through the
State Poverty Alleviation for farmers empowerment to boost food
production. The money was disbursed to the Farmers Cooperative
Societies through Micro Finance Banks throughout the State. A total
of 253 Cooperative Societies (11 each per L.G.A.) with a total
membership of 3,795 benefited from the programme.
We have evolved the revolving micro-credit delivery system which is
intended to reach out to all in Kaduna State with a pragmatic credit
delivery arrangement for economic empowerment and poverty
alleviation of the citizenry. It is a public private sector
partnership arrangement through identified banks in the State.
In 2008, N120million was disbursed through 20 Microfinance banks in
Kaduna State. By the end of 2008, the N120million disbursed was 100%
recovered. 4,478 people (out of which 1,637 were females) across the
length and breath of Kaduna State had access to the N120million
credit and the number of people in the various economic activities
of the beneficiaries was 7,705.
YOUTH AND SPORTS DEVELOPMENT
We
were accorded the Hosting rights of the 16th Edition of
the National Sports Festival in 2006. However, part of our Policy on
Youth Development is the promotion of Sports through various means
including sports and its development. Therefore, the hosting of the
16th National Sports Festival fulfils one of the cardinal
objectives of the State's Policy on Youth Development and
Empowerment.
To
provide a long lasting legacy to the youths of Kaduna State and
indeed Nigeria, the State has gone all out to provide befitting
sporting facilities of international standard not only for the
festival but towards our well-structured sports development plan.
Notable amongst these facilities are; an Olympic Size Swimming Pool,
a Synthetic Turf Hockey Pitch, a Laterite Hockey Pitch, a Gymnasium
and Courts for various Indoor and Outdoor Sports activities,
including infrastructure and facilities, such as the Mondo Super
Flex A, Tartan Tract at Ahmadu Bello Stadium, which is of the same
standard with the type used during the Beijing Olympics in China.
HOUSING/ KADUNA MILLENNIUM CITY
We have reached an advanced stage in the provision of Housing for
low-Income Earners and the Civil Servants in Kaduna State, which
will consist of the construction of 1000 houses in the Kaduna
Millennium City, 300 houses in Zaria and 200 houses in Kafanchan.
Kaduna Millennium City is an innovative new urban development
project initiated by this Administration. The city will sit within
the rolling slopes of the eastern bank of the River Kaduna. The
natural streams and valleys found in this lush landscape serve as
the idyllic backdrop of the city's future residents and visitors,
helping to create a grade-style retreat with luxury and recreational
facilities and a quality lifestyle. The city will feature:-
(i)
up to 110,000 residents in 18,000 homes
(ii)
new Golf Course with views across the river
(iii)
900 + hectares of prime development land for the growing city
of Kaduna
(iv)
Easy access to the Kaduna City centre via the new river
Kaduna bridge
(v)
Easy access to both Abuja and Kano by the proposed Kaduna
Eastern Bye-Pass.
(vi)
Integrated transport strategy providing connections to
central Kaduna and the wider locale, and also linking to the
potential express train service between the millennium city and
Abuja Central Business District.
ADMINISTRATION
Government has awarded contract and work has commenced on the
expansion of the administrative wing of the Sir Kashim Ibrahim House
(Government House) at the cost of N2.9Billion to Messrs Julius
Berger PLC with a construction period of 2 years. This is
necessitated in view of the lack of proper and adequate enabling
working environment which has made it impossible for all the
supporting staff to be accommodated within the Government House and
is affecting the normal service delivery by Government. This
administrative edifice will, when completed, provide the enabling
environment for a better performance and service delivery to the
people of Kaduna State.
We have repositioned the Civil service for optimal performance. We
have provided ICT Training and have paid Premium as Life Assurance
to encourage enhanced performance of workers. We have increased
Pensions by over 40% while salaries and other allowances were
reviewed upwards.
Our civil servants have also benefited from our Micro-Credit Loans
disbursed as housing, motor vehicles loans, etc. our relationship
with labour has been sustained. We have cooperated with each other
even at the most trying times. We had also fulfilled and paid up the
promises we made to them.
BUREAU FOR BUDGET MONITORING & PRICE INTELLIGENCE (BMPI) DUE PROCESS
The Bureau for Budget Monitoring & Price Intelligence (BMPI)
otherwise commonly referred to as the Due Process Office has made
significant strides in the year ended 2008. In an end-of-the-year
report covering ministries, Extra-Ministerial Departments, including
parastatals, they towered in the areas of Capital Projects, Contract
Award and Payment Certifications and Bidding Processes.
A total of N445,747,099.00 was made as savings in 2008. The
Bureau is hoping to improve on that in the year ending 2009.
GENERAL PERFORMANCE DATA
In addition to the performance and achievements stated above, it is
worthy to note that a good number of projects inherited and those
initiated by this administration were completed in the year under
review. These items include but not limited to the following
projects:-
ZONE I
|
|
PROJECT |
L.G.A. |
|
1 |
Sadauki Abashe Road, Likoro Hunkuyi CAP-Jaf'afaru, S/Gari,
Zaria |
S/Gari/Zaria |
|
2 |
Janfalan-Kargi Saya-Saya-Kano |
Ikara |
|
3 |
Sayi Rafin Yashi |
Zaria |
|
4 |
New Business Apprenticeship |
Hunkuyi-Kudan |
|
5 |
Construction of Blocks of 2 Classrooms At Ikara |
Ikara |
|
6 |
Construction of new Government Secondary School, Makarfi |
Makarfi |
|
7 |
Remodeling/Upgrading of Health Clinic At Paki |
Ikara |
|
8 |
Chikaji Industrial Area Road |
S/Gari |
|
9 |
Remodeling/Upgrading of Health Clinic At Gubuchi |
Makarfi |
|
10 |
Construction of Secondary School, Zaria |
Zaria |
|
11 |
Joint electricity project at Kayaba, Takalafiya and U/Mamida |
Soba |
|
12 |
Ramin Kura-Kahugu-Gure Road |
Lere |
|
13 |
Sauwala – Pampaida Road |
Ikara |
|
14 |
Kaduna/Kano Express Road |
Kudan |
|
15 |
Ramin Kambari-Ramin Doko Road |
Zaria |
|
16 |
Durumi |
Zaria |
|
17 |
Joint Electrification Project at Tashan Kanawa and Gumbi |
Kudan |
|
18 |
Remodeling/Upgrading of Health Clinic at Kudan |
Kudan |
|
19 |
Joint Electrification project at Dan Alhaji II |
Lere |
|
20 |
Joint Electrification Project at Bundun Kahugu |
Lere |
|
21 |
Remodeling/Upgrading of Health Clinic |
Lere |
|
22 |
Joint electrification project at kyaude 'A' and 'B' |
Kudan |
|
23 |
Joint electrification project at U/Marimari, Tafida, U/Kwadi |
Makarfi |
|
24 |
Government Secondary School Garu |
Soba |
|
25 |
Joint electrification projects at Rafin Yashi and Kafin
Mardani |
Zaria |
|
26 |
Joint Electrification Projects at Konterisha and Katanga |
S/Gari |
|
27 |
Joint Electrification Projects at Mah, Kareh and Kargi |
Makarfi |
|
28 |
Joint Electrification Projects at Dorayi and Bahau |
Kudan |
ZONE II
|
|
PROJECT |
L.G.A |
|
1 |
Kaduna New City Layout |
Chikun |
|
2 |
Supply And Installation of 2 Nos Lift Machine/Medical
Equipment At Barau Dikko Specialist Hospital |
K/North |
|
3 |
Joint Project (Electrification) at Kangimi |
Igabi |
|
4 |
Government Secondary School Babban Saura |
Chikun |
|
5 |
Amana-Turunku-Road Construction |
Igabi/Zaria |
|
6 |
New Government Secondary School Kakangi |
Giwa |
|
7 |
Makera Industrial Area Roads Network U/Boro, Barnawa, &
Zubairu Sambo Road Projects |
K/North/South |
|
8 |
Re-modelling/Upgrading of Health Clinic At Randagi |
B/Gwari |
|
9 |
Construction of Government Secondary School Kakangi |
Giwa |
|
10 |
Kwanan Farakwai-Turunku Road |
Igabi |
|
11 |
Abba Habbi/Makarfi Road |
K/North |
|
12 |
Government School School Rigasa |
Igabi |
|
13 |
Marafa Estate/Dantunku Roads |
K/North |
|
14 |
Legislators Quarters Services Roads |
K/North |
|
15 |
Giwa-Turawa-Kakangi Roads |
Giwa |
|
16 |
Danja/Jagaba/Shere Close/Gandog/Nisama Roads |
K/North/K/South |
|
17 |
Latai Tombai Road, Malali Kaduna |
K/North |
|
18 |
Shettima Close/Sani Sambo Avenue/Hassan Hyet Crescent,
Kaduna |
K/North/K/South |
|
19 |
Shehu Idris-Hong Avenue, Kaduna |
Kaduna South |
|
20 |
Zangon Shanu-Bye-Pass, Abuja |
K/North/Igabi |
|
21 |
Layin Kosai, Bashama and Madobi Roads, T/Wada, Kaduna |
K/South |
|
22 |
Joint Electrification Project at Tabani And Kuyello |
B/Gwari |
|
21 |
Joint Electrification Project at Sako |
Giwa |
|
22 |
Joint Electrification Project at Dogon Dawa |
B/Gwari |
|
23 |
Joint Electrification Project at Kuyawa and Guga |
Giwa |
|
24 |
Jos, Wushishi and Rock roads, Kaduna |
K/North/K/South |
|
25 |
Joint Electrification Project at Foundation |
Igabi |
|
26 |
S.M.C. Quarters-K/Kibo-Durumi Road |
K/North |
|
27 |
Joint Electrification Projects at Budda and Kajuru Staton |
Kajuru |
|
28 |
Joint Electrification Projects at Dinki and Gwada |
Igabi |
ZONE III
|
|
PROJECT |
L.G.A. |
|
1 |
Keyya-Gegira Road Project |
Jema'a |
|
2 |
J/Kogo-Gidan Jibrin-Daddu Road Project |
Jaba |
|
3 |
Joint Electrification Project At U/Ibrahim And Agamati |
Sanga |
|
4 |
Remodeling and Upgrading of Health Clinic at Abet |
Z/Kataf |
|
5 |
Soba, Jagindi, Magajiya, Bauchi, Rehabilitation Centere,
Kano, Iloring And Palace roads Projects, Kafanchan |
Jema'a |
|
6 |
Joint Electrification Projects at Bidde And Kwarebbe |
Jema'a |
|
7 |
Supply and Installation of General Hospital Kafanchan |
Jema'a |
|
8 |
Adduan Gidal/Catholic Dioceses road |
Jema'a |
|
9 |
Government Secondary School Antong |
Kachia |
|
10 |
Joint Electrification at Zaman Dabo |
Z/Kataf |
|
11 |
Joint Electrification Project at K/Masara |
Z/Kataf |
|
12 |
Remodelling/Upgrading of Health Clinic at Kachia |
Kachia |
|
13 |
Gwantu-Wasa Road |
Sanga |
|
14 |
Remodelling/Upgrading of Health Clinic at Kagarko |
Kagarko |
|
15 |
Remodelling of Health Clinic at Geshere |
Kauru |
|
16 |
Remodelling of Health Clinic at Tachira |
Kauru |
|
17 |
Kiffin Chawai Bridge |
Kauru |
|
18 |
Joint Electrification Project at Galadimawa |
Kauru |
|
19 |
Government Secondary School Kushe |
Kagarko |
|
20 |
Joint Electrification Project at Aribi and Marraban Aribi |
Kagarko |
|
21 |
Joint Electrification Project at Fadan Daji |
Kauru |
|
22 |
Joint Electrification at Sharp Corner U/Yashi and Ate |
Z/Kataf |
|
23 |
Joint Electrification Project at Sambe and Dorawa |
Sanga |
At this juncture, it is important to note that
arrangements have been concluded to commence commissioning of these
projects numbering over 500 immediately after the hosting of the
National Sports Festival. Each member of this honourable house shall
commission the projects in his constituency based on the positive
effort made by each one of you in ensuring that your constituencies
benefited from the various government programmes.
BUDGET 2009
The 2008 Budget was tagged "THE PEOPLE'S BUDGET" because it was in
that year's budget that the people oriented programmes were embarked
upon and satisfactorily executed. The 2009 Budget is different in
content and style of execution. Succinctly put, it is a
"Performance-Based Budget", a system that seeks to address the key
sectors the budget is tailored to achieve. Therefore, in putting
together the 2009 Budget, a lot of factors were put into
consideration with regards to resources accruing to the State. It
includes funds from the Federation Accounts referred to as Statutory
Allocations, Internally Generated Revenue (IGR) and funds from other
sources that include but not limited to grants, local and
international soft and long term development funds and counterpart
funded programmes.
The situation of Statutory Revenue will not be the same as last year
because of the gloomy financial forecasts resulting from the global
financial meltdown and the fall in the price of crude oil in the
International Market. Armed with this uncomfortable situation, we
are of the view that the revenue accruing to the States from this
source will certainly be affected. To create its own economy that is
self-sustaining and that will outlive the administration, Government
is making concerted efforts to boost its Internally Generated
Revenue potentials. This, it pursued by exploring all internally
generated revenue avenues and by modernizing the tax generation
agencies in the State. This initiative is supported by the World
Bank and DFID assisted Governance & Capacity Building Schemes. When
properly implemented, it will double the efforts of the State in the
revenue generation drive and minimize revenue losses. Government is
determined and desirous to attain this optimal performance, as such
all the necessary support will be accorded to these agencies. In
fact, I am now participating directly in the Board of Internal
Revenue in order to avail them all the support that is necessary for
the achievement of their objectives.
Accordingly, to meet the yearnings and aspirations of the people of
the State, this year's budget estimate is tagged "BUDGET OF
CONSOLIDATION & STABILIZATION". Inspite of the expected fluctuations
of the price of crude oil in the international market, we are
committed to ensuring that our philosophy of socio-economic reforms
are attained. Within the available resources at our disposal, we
shall ensure the empowerment of our people while safely executing
our programmes and projects.
REVENUE PROJECTION FOR 2009
A revenue defence meeting was held during which all revenue
generating Ministries/Departments and Agencies (MDAs) defended their
revenue forecast.
The total projected revenue for the 2009 fiscal year stood at N153,170,483,705.
This is made up of the following components:-
|
(i)
|
Opening balance |
8,123,644,125 |
|
(ii)
|
Internally generated revenue |
11,210,332,410 |
|
(iii)
|
Statutory Allocation from Federal Government |
36,865,403,620 |
|
(iv) |
Value Added Tax (VAT |
5,400,000,000 |
|
(v)
|
Other Capital Receipts |
91,571,103,550 |
|
Total Estimated Revenue |
N153,170,483,705 |
PROPOSED EXPENDITURE FOR 2009
Recurrent Expenditure
After due consideration, the proposed Recurrent Expenditure for the
year 2009 is as follows:
|
(i) |
Consolidated Revenue Fund Charges |
3,141,000,000 |
|
(ii) |
Personnel Costs |
15,573,170,420 |
|
(iii) |
Overhead Costs |
14,644,351,105 |
|
(iv) |
Public Debt Charges (Repayments) |
1,000,000,000 |
|
(v) |
10% to Local Government Joint Account |
800,000,000 |
|
|
TOTAL |
N35,158,521,525 |
CAPITAL
We considered the allocation of Roll-over Projects and other Capital
Receipts as Counterpart Funding. External Loans Draw-Downs,
Ecological Funds, Human Development Fund, MDGs Projects and
State/Local Government Joint Projects. The table below highlights
the allocations:
|
(i) |
Roll-over projects and others |
43,412,367,045 |
|
(ii) |
Counterpart Funding |
10,156,842,200 |
|
(iii) |
Loans draw-downs |
37,091,472,655 |
|
(iv) |
State contribution to Joint Projects |
16,740,408,160 |
|
(v) |
Local Governments contribution to Joint Projects |
10,610,872,120 |
|
|
|
N118,011,962,180 |
HIGHLIGHT OF 2009 BUDGET
The total Budget size envisaged for 2009 is N153,170,483,705
as estimated from the total expected receipts of same amount. In the
2009 Draft Estimates, attention is basically going to be focused on
Education, Power, Transport, Security, Health, Water Supply and
Agriculture.
In the Agricultural Sector, we are making efforts to
reduce poverty and generate employment opportunities for our people.
We have therefore set the pace in the provision of various dams and
irrigation projects in various locations within the State.
Furthermore, the State is implementing the following programmes:
1.
World Bank assisted $30millionUSD Commercial Agricultural
Development Project (out of which the State will provide
$6millionUSD as Counterpart Funds);
2.
World Bank assisted Fadama III Project $1.156 USD while the
State is expected to contribute $265,720 USD as Counterpart Funds.
3.
African Development Bank (ADB) Community-based Agricultural
and Rural Development Project N468,450,000 including
Counterpart Funds of N20million.
4.
World Bank/ADB assisted Root and Tuber Expansion Programme
N400million.
These are intended to also provide employment to our teeming
unemployed youths in the rural as well as urban areas of the State.
Similarly, we have made a provision of 1% of the Capital
Budget in this year's estimates to support and add as complimentary
to our efforts in financing our State Micro-Finance Banks, the aim
of which is to ensure that financial services are made available to
the vast majority of the low income earners and the poor to engage
in productive activities and to create jobs amongst others.
We intend to continue with the articulated programme on
free medical treatment for Pregnant Women and Children under five
(5) throughout the State. Government intends to increase the number
of Hospitals to be covered under this programme from 115 PHCs to 220
PHCs. In 2009, in addition, we have gone a step further to build a
state-of-the-art specialist and teaching hospital in Kaduna
Millennium City with a capacity of 200 beds and diagnostic and
medical facilities to arrest related diseases. This will be done in
a Public-Private Partnership (PPP) arrangement.
Under the Transport Sector, all the on-going projects
will be duly completed. New awards would also be made to take care
of some critical areas. In view of this, the State Government has
allocated the sum of N4.4 billion to ensure success in this
direction.
The Education Sector in the State has maintained the
tempo on the general provision of infrastructure that includes but
not limited to repairs, renovation, rehabilitation and equipping of
schools in the State. Coupled with this, more teachers have been
recruited to provide adequate qualitative and quantitative teaching
in primary, secondary and tertiary institutions. Other priority
programmes implemented includes free and compulsory Primary
Education through the issuance of free uniforms, textbooks and other
accessories. The State is committed to commence implementing the 27%
new salary scale for teachers in this year's budget.
As a reprieve to our parents and to cushion the effects
of the harsh economic downturn occasioned by the relatively low
sources of income, the Government has supplemented last year's
feeding with N112 million to boarding secondary schools in
the State. It also intends to start giving free feeding to primary
school pupils on a pilot scheme and also construct staff quarters
for primary school teachers in the State.
These development efforts embarked upon by Kaduna State
Government has attracted the attention of our development partners
within and outside the State. Private sector establishments have
indicated interest in partnering with the State to promoting non-oil
sector ventures based on the high potentials that abound in the
State. The international community has also expressed enthusiasm to
enter into partnership arrangements with the State to further
support our social sector reforms, poverty alleviation
programmes and other sectoral development efforts. Pursuant to this,
the State has already embarked on new projects with the development
partners in the following broad areas:-
1.
Governance and Capacity Building Project- a World-Bank and
DFID sponsored initiative which has finally taken off in the State;
2.
Kaduna State - Japan initiative for production and export of
ginger, cassava, acha and beniseed; and the Kagoro Hills
Holiday Resort.
3.
Kaduna State - India Initiative for Cottage Industry
Development and Skills Acquisition;
4.
Kaduna State - China Initiative for the production,"
processing and export of ginger, sugarcane, cassava etc;
5.
The State and Local Government Project (SLGP) has already
been mobilized in the State and had commenced its training
programmes;
6.
The Partnership between Kaduna State and the World Bank, DFID
and USAID will take off to address Power, Water and related issues,
Education as well as Agricultural programmes.
7.
The partnership for the Transformation of Health Systems
(PATHS) between DFID and the State has commenced effective work in
the health sector.
These projects along with other on-going initiatives are aimed at
transforming the State. We plan to eradicate poverty and enhance the
general well-being of our people. In addition, we are working
closely with the Millennium Development Goals (MDGs) office and
indeed have embarked on collaborative projects on solar power supply
to 12 villages, namely Kurumtumawa in Makarfi, Katsalle in Ikara,
Fantan in Zaria, Riwa in Lere, Kono in Kauru, Ngade in Birnin-Gwari,
Angwan Arha in Kajuru, Ungwan Maje in Chikun, Ngarde in Kachia,
Kusom in Jema'a, Dogon Daji in Sanga, Ashafa in Igabi; 50Nos
VIP Toilets, over 500nos boreholes, rehabilitation of
clinics and Primary Health Care Centres, Maternal mortality
programmes, War Against Malaria, that are at various levels of
execution. We intend to ensure that we derive full benefits from
the Debt Relief Fund.
CONCLUSION
The budget estimate for this year Mr. Speaker, Honourable
Members have addressed both the ongoing projects and the zeal with
which the State is determined to complete them and the new projects
proposed shall be dispensed in the manner in which we shall meet
your expectations and that of the electorates.
We are putting in place solid and needed infrastructure
that include security, power generation, large irrigation schemes,
expanded education, provision of health services and modern and
effective transportation system that will lead to the creation of an
industrialized, new and prosperous Kaduna State.
We have adopted varied systems of contract execution in
all fields of our socio-economic development. We appoint consultants
to give us professional and specialist designs and recommendations
which are in conformity with the internationally accepted practice
the world over. We have discarded the old order in Road Construction
of "Contractor Design and Construct" to a more transparent
and Best Practice system where the projects are properly designed
and bidded by various contractors. We had taken the pains to address
some long outstanding problems that have been lingering, which have
militated against the steady development of the State. We have
embarked on solid, meaningful and viable projects at the expense of
unjustified accusations by cynics for "slow but steady progress" in
the State development. We are assuring the good people of the State,
that what we are pursuing once completed will immensely add to the
fortunes of the State and place it in an enviable position among its
contemporaries. We shall not be deterred by retrogressive elements
neither shall we be distracted from attaining our lofty ideals and
dreams.
We shall continue to pursue Kaduna State of our dreams and
further enhance our Welfarist programmes and projects because we
believe our people deserve the best service from a government that
they put in place.
Mr. Speaker, Honourable Members, may I use this
opportunity to once again thank you and the Hon. Members for your
support and cooperation without which we could not have achieved the
lofty targets we had set for ourselves. Let me appreciate our
Religious Leaders, Traditional Rulers, Politicians, NGOs, Labour
Unions, Security Agencies, Media Organisations and the good people
of Kaduna State for their support and cooperation towards attaining
successes we have recorded so far.
The Judiciary has lived up to its expectations as the last
hope of the common man. We appreciate them in the matured way they
had handled all adjudications before them to the admiration of all.
We urge them to maintain the tempo as it has rejuvenated hope for
the citizens of Kaduna State and the country in general.
Finally special gratitude goes to our civil servants for
the maturity and understanding they have shown under difficult and
enticing circumstances. Their support and cooperation has to a large
extent, contributed to the remarkable success this
Administration has achieved. May God protect and guide us all, Ameen,
Thank you and God bless.
FFor more story click:
Sambo Presents 2009 Budget
|